LIVE1,075,356 miles delivered
Skip to content
MegaWatts Mobile Charging

Charging-as-a-Service · Manhattan

EV Charging-as-a-Service in New York.

Manhattan has strong incentives but very little space and slow electrical upgrades in existing buildings. CaaS brings capacity to garages and depots now, without opening the street.

  • 1New York service areas
  • 1utility territory
  • 44ZIP codes served

MegaWatts Charging-as-a-Service delivers megawatt-class fleet charging in Manhattan as a run-for-you service. Hardware, energy and 24/7 operations are billed per kWh or per dispenser, with no equipment purchase and no utility upgrade to wait for.

Service area

Charging-as-a-Service locations in New York.

Tap a pin to open that city's Charging-as-a-Service page.

New York programs

What New York fleets should know before they build.

  • Open

    Con Edison PowerReady Medium- and Heavy-Duty Pilot

    Incentives covering up to 90% of eligible make-ready costs for medium- and heavy-duty fleet charging infrastructure.

    With CaaS: Even with make-ready covered, construction and energization take time. Mobile CaaS charges the fleet in the meantime.

  • Open

    New York Truck Voucher Incentive Program (NYTVIP)

    NYSERDA's point-of-sale vouchers for battery-electric trucks, relaunched in August 2025 with $53 million and expanded to Class 3.

    With CaaS: Vouchers lower the vehicle price. CaaS keeps charging off your balance sheet, so the truck is the only capital item.

Federal credits

Program status checked October 2026. Programs change; we confirm current eligibility for your address in the Site Power Plan.

Utility territory

Con Edison.

Compared

Build, share or subscribe in New York.

Three ways to charge a fleet in New York
Build and own chargersPublic or shared charging hubMegaWatts Charging-as-a-Service
Upfront costChargers, switchgear, trenching and design paid up front; rebates reimburse part later.None, but you pay public or shared rates.None. One rate per kWh or per dispenser.
When charging startsAfter design, permits, utility upgrade and energization.When a hub exists on your routes.As soon as blocks are delivered and commissioned on your yard.
Where vehicles chargeYour depot.Off site: drivers detour, queue and return.Your depot, during your existing dwell window.
Who runs itYou or a maintenance contractor.The hub operator, for all customers.MegaWatts, 24/7, under a written SLA.
If the fleet grows or movesNew project, new utility application.Depends on hub capacity.Add or relocate blocks under the same agreement.

Prefer to see the dispatch side? Mobile EV fleet charging in New York.

FAQ

New York Charging-as-a-Service questions.

Where is Charging-as-a-Service available in New York?

Manhattan. Each city page lists the ZIP codes we cover. 44 ZIP codes in total across Manhattan.

Which utilities serve these New York sites?

Con Edison. CaaS works the same in every territory because the blocks connect to the service you have, or run without one.

Is Charging-as-a-Service cheaper than building chargers in New York?

It depends on fleet size, daily energy and how long you'll stay at the site. CaaS removes the upfront equipment and construction cost and turns charging into a per-kWh or per-dispenser rate. The Site Power Plan shows both paths for your address.

What happens to CaaS if we later build a permanent depot?

Exit and relocation terms are set in your agreement. Most fleets keep running on CaaS until the permanent site is energized, then the blocks move or stay as backup.

Start here

Get a Charging-as-a-Service quote in New York.

Address and fleet size to start. A free Site Power Plan in 48 hours, then a per-kWh or per-dispenser rate for your site.

Prefer the phone?

888-675-9555
888-675-9555Get a Power Plan