Mobile EV fleet charging, delivered to your yard.

Megawatt-class DC fast charging for delivery, trucking, robotaxi and dealer fleets. On site in days, run 24/7, with no utility upgrade to wait for.

  • 5states
  • 50city service areas
  • 335ZIP codes served

MegaWatts provides mobile EV fleet charging: trailer-mounted, megawatt-class charging blocks and DC dispensers delivered to the yard where a fleet already parks. It serves fleets of 50 or more vehicles or sites that need 500 kW and up, in Miami-Dade and Broward; Boston and the North Shore; Los Angeles, Orange County, San Diego and the Bay Area; Manhattan; Chicago and the North Shore, and is usually billed as Charging-as-a-Service.

How it works

From address to charged fleet.

  1. 01

    Site Power Plan

    Send the address and fleet size. In 48 hours you get kW, kWh, block count, layout and a days-to-live date. Free.

  2. 02

    Delivery

    Trailer-mounted power blocks and dispensers arrive on your yard. No trenching, no switchgear, no utility application.

  3. 03

    Charging

    Vehicles plug in during your existing dwell window. Blocks run on battery storage, an existing service of any size, or both.

  4. 04

    Operations

    24/7 monitoring, maintenance and replacements under a written SLA, with per-vehicle reporting.

By fleet type

Fleet charging for every kind of fleet.

Row of electric delivery vans parked beside a trailer-mounted mobile DC charging unit in a parking lot
Delivery service partner vans charging from a mobile trailer unit

Ways to buy

Buy charged vehicles, not chargers.

Most fleets take mobile fleet charging as Charging-as-a-Service: hardware, energy and 24/7 operations billed per kWh or per dispenser, with no equipment purchase. It's available in every city we serve.

Charging-as-a-Service locations · Pricing · Megawatt charging blocks

Compared

Utility upgrade, diesel rental, or mobile fleet charging.

How MegaWatts compares with the two alternatives most fleets price first.
Utility upgradeDiesel generator rentalMegaWatts
Time to power8–36 monthsDays, but not chargersDays
Upfront capex$1M–$10M+ per depotLow, plus fuelCustom, quoted per site
Emissions on siteGrid mixDiesel exhaust, permitsBattery-first, low-emission source
NoiseNone70–85 dB continuousBattery-quiet at the dispenser
Scales with the fleetRe-permit and re-trenchMore gensets, more fuelAdd blocks in days
Written SLANoRental terms onlyPublished, with credits
Exit when grid arrivesIs the gridStranded rentalBlocks relocate, no stranded asset

FAQ

Mobile EV fleet charging questions.

What is mobile EV fleet charging?

Fleet charging that comes to the vehicles. Instead of building a fixed depot and waiting for a utility upgrade, megawatt-class charging blocks and DC dispensers are delivered to the yard where the fleet already parks, and charge vehicles during their normal dwell window.

Which fleets is it for?

Fleets of 50 or more vehicles, or sites that need 500 kW and up: last-mile delivery and Amazon DSPs, semi and drayage fleets, autonomous and robotaxi depots, OEM and dealer lots, and events that need temporary power.

Do we need a utility upgrade?

No. Blocks carry battery storage and connect to an existing service of any size, or run without one. Charging starts while any permanent upgrade works through the utility queue.

Where do you provide fleet charging?

In Florida (Miami-Dade and Broward), Massachusetts (Boston and the North Shore), California (Los Angeles, Orange County, San Diego and the Bay Area), New York (Manhattan), Illinois (Chicago and the North Shore): 50 city service areas and 335 ZIP codes. Outside them, send the address and we confirm coverage in the Site Power Plan.

How do we pay for it?

Per site, quoted after a Site Power Plan. Most fleets choose Charging-as-a-Service, billed per kWh or per dispenser with no equipment purchase.

Is it temporary or permanent?

Either. Some fleets use mobile charging as a bridge until a depot is energized; others run on it long term because it moves and scales with the fleet.

Start here

Get a fleet charging plan for your site.

Address and fleet size to start. kW, kWh, blocks, layout and days-to-live in 48 hours. Free, whether or not you buy.