Skip to content
MegaWatts Mobile Charging
LIVETracking since Oct 2026 · 0 kWh delivered

MegaWatts Depot

Depot charging for 100+ vehicles, before the utility upgrade.

Delivery, rental, rideshare, transit and municipal depots stuck behind a multi-year interconnection. Charging-as-a-Service, on site.

  • 0 $upfront capex
  • 7 daysto first chargeConfirm
  • 1 MW+per power blockConfirm
Delivery van depot at dusk with a mobile 700 kW power block feeding a row of DC dispensers
700 kW block · 4 × 150 kW dispensers · CaaS

MegaWatts Depot provides Charging-as-a-Service for delivery, rental, rideshare, transit and municipal depots with 100 or more vehicles. Mobile 700 kW to 1 MW+ blocks with on-board storage power DC dispensers on site in days, with energy, maintenance and 24/7 monitoring included under a written SLA, billed per kWh or per dispenser at a rate set in your quote.

The depot problem

The vehicles were approved in one budget cycle. The interconnection will take three.

Depots electrify faster than utilities can serve them. A 150-van depot needs 1–2 MW at night; a typical service upgrade runs 3–18+ months and major grid work 18–36. The vans are already delivered.

Starting point

Where a fleet like yours usually starts.

Recommended configuration

150-van delivery depot

  1. 1 · Vehicles

    150

    120 kWh pack · 8 hr window

  2. 2 · Energy per day

    9,000 kWh

    60 kWh per vehicle

  3. 3 · Power required

    1.2 MW

    at 92% charger efficiency

  4. 4 · Power blocks

    2 × 700 kW blockConfirm

    1.4 MW installed

  5. 5 · Dispensers

    12

    150 kW each · 0.4 hr session

  6. 6 · Footprint

    2,640 sq ftConfirm

    blocks + dispenser lanes

  7. 7 · Days to live

    7Confirm

    from signed site plan

Planning estimate. Your Site Power Plan replaces every number here with a measured one within 48 hours.

Get a Site Power Plan

Compared

The alternatives, priced honestly.

How MegaWatts compares with the two alternatives most fleets price first.
Utility upgradeDiesel generator rentalMegaWatts
Time to power8–36 monthsDays, but not chargersDaysConfirm
Upfront capex$1M–$10M+ including switchgearLow, plus fuel and no chargersCustom, quoted per site
Emissions on siteGrid mixDiesel exhaust, permitsBattery-first, low-emission sourceConfirm
NoiseNone70–85 dB continuousBattery-quiet at the dispenser
Scales with the fleetRe-permit and re-trenchMore gensets, more fuelAdd blocks in days
Written SLANoRental terms onlyPublished, with credits
Exit when grid arrivesIs the gridStranded rentalBlocks relocate, no stranded asset

Calculator

Size it yourself.

Quick sizing

Three numbers. One power figure.

Required on-site power

1.2 MW

Energy per day
9,000 kWh
BlocksConfirm
2 × 700 kW block
Dispensers
12
FootprintConfirm
2,640 sq ft
Days to liveConfirm
7
Session
0.4 hr

Specs that matter for depots

What a depot deployment ships with.

Dispensers
4–8 per block at 150 kW, power shared overnightConfirm
Connectors
NACS · CCS1
Commercial
Billed per kWh or per dispenser, quoted per site
Operations
Energy, maintenance, 24/7 NOC included
Telemetry
OCPP 2.0.1 to your fleet platformConfirm
Exit
Blocks relocate when your utility service is live
  • Standards
  • UL 1973Confirm
  • UL 9540AConfirm
  • UL 2202Confirm
  • OCPP 2.0.1Confirm
  • ISO 15118Confirm
  • CARB / EPAConfirm

In the field

What shows up on site.

  • Electric delivery vans and four mobile DC charging pods on flatbed trailers in a gravel yard under a blue sky
    Delivery vans and mobile charging pods staged in a yard
  • Trailer-mounted mobile DC charging pod plugged into an airport shuttle bus at sunset in a parking lot
    Shuttle bus charged from a mobile DC pod at end of shift
  • Three dual-port DC fast chargers lit green at night on a temporary pad with a rental power unit behind them
    Temporary DC fast charging pad at night, powered on site

FAQ

Depots questions, answered.

What happens when our utility upgrade finally arrives?

The blocks leave or stay as backup. Exit terms for an early utility go-live are set in your agreement, so there is no stranded asset.

Do you need a permit at our depot?

Usually a temporary electrical permit for the dispensers, which we file. No trenching or switchgear changes inside your building.

How loud is it?

Battery-quiet at the dispensers. Any generation runs enclosed at the far side of the pad.

Is there an upfront cost?

There's no published rate for Charging-as-a-Service. Billing runs per kWh or per dispenser per month at a rate set in your quote.

What term do you require?

Term length is set in your quote, from a short pilot up to a multi-year agreement.

Can you scale as we add vehicles?

Yes. Add a block or a dispenser lane in days, not another interconnection application.

Start here

Get a depots Site Power Plan in 48 hours.

kW, kWh, blocks, layout and days-to-live for your site. Free, whether or not you buy. Three fields to start.

Prefer the phone?

888-675-9555
888-675-9555Get a Site Power Plan