MegaWatts Depot
Depot charging for 100+ vehicles, before the utility upgrade.
Delivery, rental, rideshare, transit and municipal depots stuck behind a multi-year interconnection. Charging-as-a-Service, on site.
- 0 $upfront capex
- 7 daysto first chargeConfirm
- 1 MW+per power blockConfirm

MegaWatts Depot provides Charging-as-a-Service for delivery, rental, rideshare, transit and municipal depots with 100 or more vehicles. Mobile 700 kW to 1 MW+ blocks with on-board storage power DC dispensers on site in days, with energy, maintenance and 24/7 monitoring included under a written SLA, billed per kWh or per dispenser at a rate set in your quote.
The depot problem
The vehicles were approved in one budget cycle. The interconnection will take three.
Depots electrify faster than utilities can serve them. A 150-van depot needs 1–2 MW at night; a typical service upgrade runs 3–18+ months and major grid work 18–36. The vans are already delivered.
$800–1,500 /hr
Downtime cost for a 30-van fleet; multiply for a 150-van depot
3–18+ mo
Typical utility service upgrade timeline before chargers can be energized
Starting point
Where a fleet like yours usually starts.
Recommended configuration
150-van delivery depot
1 · Vehicles
150
120 kWh pack · 8 hr window
2 · Energy per day
9,000 kWh
60 kWh per vehicle
3 · Power required
1.2 MW
at 92% charger efficiency
4 · Power blocks
2 × 700 kW blockConfirm
1.4 MW installed
5 · Dispensers
12
150 kW each · 0.4 hr session
6 · Footprint
2,640 sq ftConfirm
blocks + dispenser lanes
7 · Days to live
7Confirm
from signed site plan
Planning estimate. Your Site Power Plan replaces every number here with a measured one within 48 hours.
Get a Site Power PlanCompared
The alternatives, priced honestly.
| Utility upgrade | Diesel generator rental | MegaWatts | |
|---|---|---|---|
| Time to power | 8–36 months | Days, but not chargers | DaysConfirm |
| Upfront capex | $1M–$10M+ including switchgear | Low, plus fuel and no chargers | Custom, quoted per site |
| Emissions on site | Grid mix | Diesel exhaust, permits | Battery-first, low-emission sourceConfirm |
| Noise | None | 70–85 dB continuous | Battery-quiet at the dispenser |
| Scales with the fleet | Re-permit and re-trench | More gensets, more fuel | Add blocks in days |
| Written SLA | No | Rental terms only | Published, with credits |
| Exit when grid arrives | Is the grid | Stranded rental | Blocks relocate, no stranded asset |
Calculator
Size it yourself.
Quick sizing
Three numbers. One power figure.
Required on-site power
1.2 MW
- Energy per day
- 9,000 kWh
- BlocksConfirm
- 2 × 700 kW block
- Dispensers
- 12
- FootprintConfirm
- 2,640 sq ft
- Days to liveConfirm
- 7
- Session
- 0.4 hr
Specs that matter for depots
What a depot deployment ships with.
- Dispensers
- 4–8 per block at 150 kW, power shared overnightConfirm
- Connectors
- NACS · CCS1
- Commercial
- Billed per kWh or per dispenser, quoted per site
- Operations
- Energy, maintenance, 24/7 NOC included
- Telemetry
- OCPP 2.0.1 to your fleet platformConfirm
- Exit
- Blocks relocate when your utility service is live
- Standards
- UL 1973Confirm
- UL 9540AConfirm
- UL 2202Confirm
- OCPP 2.0.1Confirm
- ISO 15118Confirm
- CARB / EPAConfirm
In the field
What shows up on site.

Delivery vans and mobile charging pods staged in a yard 
Shuttle bus charged from a mobile DC pod at end of shift 
Temporary DC fast charging pad at night, powered on site
FAQ
Depots questions, answered.
What happens when our utility upgrade finally arrives?
The blocks leave or stay as backup. Exit terms for an early utility go-live are set in your agreement, so there is no stranded asset.
Do you need a permit at our depot?
Usually a temporary electrical permit for the dispensers, which we file. No trenching or switchgear changes inside your building.
How loud is it?
Battery-quiet at the dispensers. Any generation runs enclosed at the far side of the pad.
Is there an upfront cost?
There's no published rate for Charging-as-a-Service. Billing runs per kWh or per dispenser per month at a rate set in your quote.
What term do you require?
Term length is set in your quote, from a short pilot up to a multi-year agreement.
Can you scale as we add vehicles?
Yes. Add a block or a dispenser lane in days, not another interconnection application.
Start here
Get a depots Site Power Plan in 48 hours.
kW, kWh, blocks, layout and days-to-live for your site. Free, whether or not you buy. Three fields to start.
Prefer the phone?
888-675-9555