Skip to content
MegaWatts Mobile Charging
LIVETracking since Oct 2026 · 0 kWh delivered

Free · 48 hours · no obligation

In 48 hours you will have a site power plan.

kW, kWh, blocks, layout, days-to-live. Whether or not you buy.

  • 48 hrturnaround
  • 50+vehicles or 500 kW+
  • FreeSite Power Plan
  • ✓Required power and daily energy for your fleet window
  • ✓Recommended MegaWatts blocks and dispensers, with a layout sketch
  • ✓Energy source options for your site and permit path
  • ✓A days-to-live date from signature
  • ✓A personal quote, built for your site

Prefer to talk first?

888-675-9555

The MegaWatts Site Power Plan is a free engineering estimate delivered within 48 hours for fleets of 50 or more vehicles or 500 kW or more of demand. It specifies required kW and kWh, mobile block and dispenser count, site layout, energy source and a deployment date, and prices the site under each published model.

FAQ

About the plan.

What exactly do we receive?

A PDF with required kW and daily kWh, recommended block count and size, dispenser count and layout sketch, energy source options, a days-to-live date, and a monthly cost estimate under each pricing model. Yours to keep and to shop.

What do you need from us?

Vehicle count and models, daily mileage or kWh, the charging window, a site address or ZIP, and what the utility has told you so far. A 15-minute call fills gaps.

Is there any obligation?

None. Most fleets use the plan to sanity-check a utility quote or a diesel rental. Some go straight to a pilot.

What happens next

From plan to first charge.

  1. 01

    Within 1 business day

    A fleet power engineer confirms inputs by phone or email.

  2. 02

    Within 48 hours

    Plan delivered as a PDF. Optional 15-minute walkthrough.

  3. 03

    When you are ready

    A pilot or a term agreement, or the plan stays in your drawer.

888-675-9555Get a Site Power Plan