Suffolk County, MA
Mobile EV fleet charging in Chelsea, MA.
Chelsea is home to the New England Produce Center and dense food-distribution and fuel terminals along the Chelsea Creek. Refrigerated trucks and delivery fleets make it one of the heaviest charging loads in Greater Boston.
- 1ZIP code served
- 2freight & fleet hubs nearby
- 6fleet services
MegaWatts Mobile Charging provides mobile DC fast charging in Chelsea, Massachusetts (Suffolk County) for semi & heavy-duty truck charging, last-mile delivery & fleet depots, on-demand mobile charging. Charging blocks arrive on a trailer and charge fleets on site near New England Produce Center, Chelsea Creek terminals, covering ZIP codes 02150.
Coverage map
Where we dispatch in Chelsea.
The Chelsea service area and the nearest city service areas around it.
Corridors we run
- Route 1 (Tobin Bridge)
- Route 16
- Route 1A
Fleet hubs we reach
- New England Produce Center
- Chelsea Creek terminals
Services
Fleet charging services in Chelsea.
Every service below is available across Chelsea. The first 3 match Chelsea's fleet mix and freight hubs.
Local focus
Semi & heavy-duty truck charging
Class 6–8 trucks, drayage and yard tractors running out of Chelsea. Megawatt-class mobile charging on the pad, sized for routes that start and end around New England Produce Center.
Semi & heavy-duty truck charging details →Local focus
Last-mile delivery & fleet depots
Delivery service partners, including Amazon DSPs, rental, rideshare and municipal fleets in Chelsea. Mobile DC blocks charge vans and cars on the yard during the overnight window, with no wait for a utility upgrade near New England Produce Center.
Last-mile delivery & fleet depots details →Local focus
On-demand mobile charging
Scheduled or call-out mobile DC charging for fleets in Chelsea: cover a downed charger, a surge week or a new route while permanent infrastructure is built. Billed as Charging-as-a-Service.
On-demand mobile charging details →Autonomous & robotaxi fleets
High-utilization depots for autonomous and ride-hail fleets launching in Chelsea. Relocatable DC capacity that moves with the service area instead of waiting on a fixed build.
Autonomous & robotaxi fleets details →OEM lots, ports & dealers
New EVs that must ship or sell charged: processing lots, dealer groups and port staging in Chelsea. Trailer blocks charge rows of vehicles on the lot, including near New England Produce Center.
OEM lots, ports & dealers details →Events & temporary power
Temporary DC charging and on-site power for events, hotel and condo garages, film shoots and construction sites in Chelsea. Battery-first, quiet at the dispenser, removed when the job ends.
Events & temporary power details →

On site in Chelsea
Parks on your lot. Charges your fleet. Leaves.
No trenching, switchgear or new utility service. The block connects to what your Chelsea site already has, or runs without it, and is sized to your fleet's daily energy and charging window.
ZIP codes
Chelsea ZIP codes we serve.
Don't see yours? Send the address. We confirm coverage near Chelsea in the Site Power Plan.
- 02150
Nearby
Mobile EV charging near Chelsea.
FAQ
Chelsea mobile charging questions.
Do you provide mobile EV charging in Chelsea, MA?
Yes. MegaWatts dispatches mobile DC fast charging to fleet sites across Chelsea, including ZIP codes 02150. Service runs through our provider network and is scheduled around your fleet's charging window.
Which fleets do you charge in Chelsea?
In Chelsea we lead with semi & heavy-duty truck charging, last-mile delivery & fleet depots, on-demand mobile charging, and every other service on this page is available too. We serve fleets of 50 or more vehicles, or sites that need 500 kW and up, including Amazon DSPs and other delivery service partners.
Can you charge vehicles near New England Produce Center or Chelsea Creek terminals?
Yes. Sites near New England Produce Center, Chelsea Creek terminals and along Route 1 (Tobin Bridge), Route 16, Route 1A are inside the Chelsea service area. Send the address and the Site Power Plan confirms access, pad space and timing.
Do we need a utility upgrade or permanent chargers in Chelsea?
No. Charging blocks carry their own battery storage and arrive on a trailer. They connect to an existing service of any size, or run without one, so charging starts before a permanent upgrade clears the utility queue.
How quickly can service start in Chelsea?
Request a Site Power Plan with your Chelsea address and fleet size. Within 48 hours you get kW, kWh, block count, layout and a days-to-live date for that site. You can also call 888-675-9555.
Markets
Other markets we dispatch to.
EV fleet charging in Florida
Miami-Dade and Broward
EV fleet charging in California
Los Angeles, Orange County, San Diego and the Bay Area
EV fleet charging in New York
Manhattan
EV fleet charging in Illinois
Chicago and the North Shore
Start here
Get a Site Power Plan for your Chelsea site.
Address and fleet size to start. kW, kWh, blocks, layout and days-to-live for Chelsea in 48 hours. Free, whether or not you buy.
Prefer the phone?
888-675-9555